Rehabilitation,Upgrading and Ectension Works for Karonga Town Water Supply System is located in Kalonga County, Malawi, the main implementation content is the design and construction of water supply pipeline, laying UPVC pipe 160 km, ductile iron pipe 30 km, in addition to water treatment plant, reservoir, pumping station, water distribution pipeline, office buildings and factory roads and other ancillary facilities. The project was financed by 29.5% from the Arab Bank for African Economic Development (BADEA), 63.3% from the OPEC Fund for International Development (OPEC) and 7.2% from the Government of Malawi.
The project aims to improve the drinking water sanitation of local residents in Kalonga County, while providing jobs for residents along the construction process and increasing the local employment rate, which is of great significance for local social development.